NVIDIA has lost the entire AI market in China. Huawei forecasts $12 billion in AI chip revenue for 2026 — a 60% growth. Proprietary HiBL memory, the roadmap to Ascend 970, and clusters of 520,000 chips. But the main challenge is not the hardware, but cluster stability and software. We break down what is happening and how it affects Russia.
NVIDIA 0% in China
In April 2026, NVIDIA CEO Jensen Huang told the Special Competitive Studies Project a phrase that made headlines across all global media: «Our market share of AI accelerators in China has dropped to zero.»
As recently as 2022, NVIDIA controlled about 95% of this market. Bernstein had forecast a drop to 8%, but they turned out to be optimists.
NVIDIA wrote off $4.5 billion in excess H20 inventory in the first quarter of the 2026 fiscal year. The company has completely halted H200 production for China and redirected TSMC capacity to the next generation — Vera Rubin. Huang called American export policy a failure.
This is not just a corporate loss — it is a structural shift in the global AI hardware supply chain.
Huawei: $12 billion and 60% market share
According to the Financial Times and Reuters, Huawei forecasts AI chip revenue of $12 billion in 2026 — a 60% increase from $7.5 billion in 2025. This forecast is based on already placed orders, not just plans.
Huawei’s share of the AI accelerator market in China could reach 60% by the end of 2026.
The flagship Ascend 950PR, launched into mass production in March 2026:
1 PFLOPS (FP8), 1.56 PFLOPS (FP4).
2.8 times more powerful than the NVIDIA H20 in FP4 — the only NVIDIA GPU available in China under sanctions.
112 GB of proprietary HiBL 1.0 memory.
Memory bandwidth: 1.4 TB/s.
Interconnects: 2.5x bandwidth increase over the previous generation.
Form factor: Atlas 350 card.
Huawei achieved this under absolute US sanctions, without access to TSMC, ASML, or Western HBM suppliers.
Huawei overcomes dependencies
With the Ascend 950PR, Huawei is using its own high-bandwidth memory for the first time — HiBL 1.0. Previously, all Chinese GPU startups depended on Samsung and SK Hynix for HBM — a bottleneck that created both sanction risks and scaling problems.
HiBL 1.0 is not a copy of HBM from SK Hynix; it is Huawei’s own architecture with a bandwidth of up to 4 TB/s. The first Chinese AI accelerator with a fully autonomous memory stack.
Huawei’s roadmap for the next three years:
950PR (Q1 2026): HiBL 1.0, focus on inference.
950DT (Q4 2026): HiZQ 2.0, training + decoding.
960 (Q4 2027): Next generation.
970 (Q4 2028): Doubling performance.
The trend is clear: Huawei releases a new generation every year. Every year, Huawei doubles its capacity. This is more aggressive than NVIDIA’s update cycle was before the Hopper era.
Atlas 950 SuperCluster as a strategy
Huawei is not fighting for leadership in a single chip — it is deliberately playing the cluster game.
Atlas 950 SuperCluster — a system of 520,000 950DT chips, combined into 64 supernodes. Total performance: 524 EFLOPS (FP8). The release is expected in Q4 2026.
For comparison, NVIDIA’s largest clusters on H100 and H200 consist of tens of thousands of GPUs. Huawei is building hundreds of thousands. The goal is clear: if a single chip is weaker, the strategy is to compensate with scale and system integration.
The real test is not the chip, but the cluster
And here we get to the most interesting part.
Digitimes published an analysis at the end of April 2026 titled «China’s GPU IPO Wave Meets Its Toughest Test: Cluster Stability.» Startups like Moore Threads, MetaX, and Biren have received billion-dollar investments and gone public. But the market is now demanding more.
The shift from training to inference changes the evaluation criteria:
Cluster stability: Not just whether the chip works, but whether it works 24/7 in conjunction with hundreds of others.
Software ecosystem: Operators, drivers, optimizers, ML frameworks.
Total deployment cost: Not the chip price, but the turnkey solution price.
Eight Chinese companies are building full-fledged software ecosystems, trying to escape CUDA’s gravity well. Strategies are fundamentally different — from CUDA compatibility to a clean greenfield approach.
For Huawei, the advantage in this competition lies not so much in the hardware (although the Ascend 950PR is strong) as in the CANN programming stack, which covers 95%+ of operators for Transformer, MoE, and Diffusion architectures.
Biren’s IPO fireworks in Hong Kong
In early 2026, Biren Technology debuted on the Hong Kong Stock Exchange. Shares soared 76% on the first day of trading — one of the brightest IPO starts of the year on Asian exchanges.
Biren, along with Moore Threads, MetaX, and Enflame, is part of the «Four Little Dragons» of the Chinese GPU market. Following the IPOs of Moore Threads and MetaX in Shanghai, Biren’s Hong Kong listing completed the picture: all four are now public companies with billion-dollar market caps.
Investors are not paying for current profit (all four are unprofitable), but for a geopolitical option: if export restrictions persist — and they seemingly will — Chinese GPU startups are guaranteed a $30+ billion market.
GPU-cloud consolidates around Huawei and Baidu
Tom’s Hardware noted another trend in May 2026: the Chinese GPU-cloud is consolidating around two players — Huawei and Baidu.
Baidu and Huawei are integrating their own chips (Kunlun P800 and Ascend 950PR, respectively) into full-stack clouds, from hardware to API. Vertical integration gives them an advantage over startups that sell only chips.
For MetaX, Moore Threads, and Biren, this is an alarming signal: the IPO is done, money is raised, but the market is tightening around vertically integrated giants. Without their own cloud or a deep partnership with a major provider, a chip remains just a commodity.
CANN and CUDA compatibility: lowering the entry barrier
Huawei is actively developing CANN (Compute Architecture for Neural Networks). The Ascend 950PR is declared CUDA-compatible via translation — companies can port models from NVIDIA to Huawei without rewriting the entire codebase.
Translation adds overhead, but it is sufficient for a quick transition. And for companies just starting to build AI infrastructure, it is not a question at all: they choose Ascend immediately.
What this means for the Russian market
A real alternative to NVIDIA has appeared — and it is scaling. Not a prototype, not «coming soon,» but already mass production with $12 billion in revenue and 750,000 chips per year. For Russian companies that have so far depended on gray-market NVIDIA imports via third countries, Huawei Ascend is a white-label, scalable, and supported alternative.
The problem is solved not in hardware, but in the ecosystem. The main barrier to adoption is not the chip specs, but software maturity, cluster stability, and integration with ML frameworks. Huawei with CANN is going furthest down this path. Russian integrators should focus not on paper TFLOPS, but on real deployment case studies.
Vertical integration is becoming the new standard. Huawei and Baidu sell not chips, but PAKs (hardware + software + cloud). Russian AI service providers should build similar stacks rather than assembling «zoos» of heterogeneous GPUs.
Huawei’s proprietary memory removes the bottleneck. Before HiBL, all Chinese chips depended on Samsung/SK Hynix. Now that dependency is removed — and for Russian buyers, this reduces the risk of supply chain disruptions.
Time is running out. Every quarter of delay makes migration more expensive. The longer Russian companies postpone the transition to Chinese GPUs, the more costly the model migration, engineering time, and infrastructure rebuilding will become. Chinese companies already have the experience, and it should be utilized.
Contact our experts to select the optimal hardware configuration and calculate rental pricing for your AI workloads.